Construction Photos - Page 1
On Monday, July 30, 2007, work began on the
construction of a new interior stairwell from the front (river end) of
the Sanctuary down to the lower level. Due to complications with
the foundation work that caused an earlier than expected removal of the
fire escape, the sanctuary can't be used until the new staircase has
been installed.
As a result, worship will take place in Fellowship Hall for the next
several weeks. We apologize for any inconvenience and
thank you for your patience and understanding.
We will keep
you up to date with the progress of the construction by posting
photographs on this and subsequent pages.
Photos last added 9/17/07 and can be found on
Page 4
Photos taken July 31-August 9 are on this
page.
|
|

Pictures taken 7/31/07
First came the
dumpster...... |

....then came the fencing to close off the work
area. |
|

Day 2 and the wall between the
music office and the vestry kitchen has already been opened up. In
addition a hole has been cut in the ceiling from the music office up
through the floor of the old sacristy to make way for the new stairwell. |

The view from the music office
through to the old vestry kitchen.
|
|

The front of the church is
temporarily draped in plastic as the work begins. It will be
removed each week for Sunday worship!
|

A small hole is cut from the
sanctuary below the level of the sacristy floor through to the music
office. A temporary enclosure will be built around the area before
the rest of the hole for the door is cut through (to keep dust and
debris from getting into the sanctuary). |
|

Pictures taken 8/2/07
Looking up from the music office through the hole in the floor to the
old sacristy. The hole has been enlarged to accommodate the new stairs. |

The window of the music office facing the river
has been boarded up and a new doorway cut halfway along the back wall of
the church building. |
|

A view of the hole cut for the new doorway from
the inside.
|

The old fire escape doors have been removed, half
of the fire escape taken down, and one of the doors and the window from
the music office have been resided. A new doorway has been cut in
the middle of the back wall. |
|

Pictures taken 8/6/07
Foundation
work in progress. Some of the old foundation is removed and the
back wall is shored up. The remaining half of the fire escape has been
removed and the hole from the old fire escape door resided.
|

A view of the back wall of the music office and
kitchen from the inside, showing the metal support beam in the ceiling,
and the new doorway to the outside. The ladder is leaning against
where the music office window used to be. The white column is
where the wall between the music office and kitchen was. |
|

The back hoe begins to dig a
trench.........
|

......showing the sill
supported by old brick, above a stone foundation. Note the far
side of the new doorway where the old brick has been replaced by
concrete in a previous foundation repair. |
|

Pictures taken 8/8/07
More of the foundation under the church is removed
and temporary wooden supports installed. |

Close up of the bottom of a
different section of the back wall of the church with the foundation
removed. |
|

Pictures taken 8/9/07
A wooden form has been built ready to fill with
concrete for the new foundation
|

The form for the new foundation
under the opposite end of the wall. The new exit door is on
the left of the photo and the old doorway, which will eventually be
filled in, is on the right. |
|

Inside the old winding
staircase has been removed and the closet next to it is being opened up
to form a new larger closet. (The door to
the old boiler room is on the left). |

Looking up from inside the new
closet, a new floor has been framed in where the old staircase used to
be. The room above will be the new sacristy (on the opposite
side of the altar to the old sacristy). |
| Page 2
of
photos -
taken August 14-21
Page 3 of photos -
taken August 22 -September 7
Page 4 of photos taken
Sept 10 and later |
|