Construction Photos - page 4

We will keep you up to date with the progress of the construction by posting photographs on these pages.  

Photos last added to website on 9/17/07.          Most recently added photos

Photos taken September 10 and later are on this page         Page 3 of Photos taken August 22-September 7

                                                                                          Page 2 of  Photos taken August 14 -21         

                                                                                          Page 1 of  Photos taken July 31-August 9

Picture taken 9/10/07  The bricks in the sidewalk are removed in preparation for digging up the driveway.
 

Picture taken 9/11/07  The driveway is dug up to expose the top of the concrete chamber containing the steam pipe and others that run from the education building to the church building........ and it's finally raining!

Pictures taken 9/12/07    Steve works on the siding.
 

The driveway is dug up ..........

....and the concrete slabs have been taken off the top to expose the pipes.  (The old steam pipe has already been removed). 

The new steam pipe is being laid.
 

Pictures taken 9/13/07   The new steam pipe and other conduits are laid

A close up of the pipes show the larger black steam pipe at the top and the smaller black condensate return pipe at the bottom.  Two new conduits were laid to carry wiring etc, and an additional 2" conduit pipe was laid before the vault was closed.

The siding has been redone as needed, and the handrails added to the back exit steps.

A close up of the new handrails.
 

Pictures taken 9/14/07   The concrete slabs have been put back to cover the pipes and and joints are sealed with cement.

Plastic sheeting has been put over the closed vault before being covered over with earth.

Pictures taken 9/17/07    Paving is laid over where the driveway had been dug up............

 

.......and also around the back of the church where the ground was dug up to work on the foundation

Trim has been added and the vestry kitchen tidied up.
 

   

 

Page 3 of photos taken August 22-Sept 7        Page 2 of photos taken August 14-21         Page 1 of photos taken July 31-August 9

Back to top                

Back to Recent Photos Page            Back to home