Pictures taken 8/22/07
The doorway through to the sanctuary to the right of the pulpit was cut
through at the end of last week. Plastic covers the area to
protect the sanctuary from dust and debris. |

The stairs arrive and are unloaded from the truck.
|
|

The area around the foundation
and the stoop is backfilled. |

|
|

The stairs have been installed
to and from the landing platform
|

Looking up the stairs (covered in plastic to
protect them).
|
|

Part of the short flight of
stairs from the landing up to the new sanctuary doorway |

Looking down the stairs from the
landing
|
|

Pictures taken 8/23/07
Bricks were laid above the top of the new concrete
foundation. |

Pictures taken 8/24/07
Framing for the wall under the stairs |
|

Inside the new sacristy,
showing the old fire escape door closed off. The window was above
the old winding stairs, and the door on the right goes into the
Sanctuary. |

Looking into the new sacristy
from the Sanctuary, showing the new floor that has been installed where
the stairs used to be. |
|

Picture taken 8/27/07 |

Picture taken 8/29/07
|
|

Picture taken 8/30/07
|

Picture taken 9/4/07 The wallboard is
up in the vestry kitchen. The new stairs and back door are behind
the wall on the right of the picture. |
|

Pictures taken 9/5/07
Work continues on the back of the building.
The new back entry door is installed and the steps are done. New
siding is being installed as needed. |

The plasterers have begun their
work in the vestry kitchen.
On the left of the picture the view is into the new closet through a
doorway. |
|

Looking through the doorway
from the vestry kitchen to the back door. The stairs are to the
right of the back door.
|

Looking up the new staircase
from just inside the back door. |
 Inside the sanctuary showing the
new doorway. |

Pictures taken 9/7/07
The new door is installed, together with panic bar and exit light. |
|

The door into the Sanctuary from
the new stairwell |

Welding the sections of handrail
together |
|

Looking up the new stairs with
handrails installed |

Looking down the stairs |
|

The doors have been installed to the closet and to
the stairwell from the vestry kitchen.
|

(Picture taken 9/11/07)
The church was cleaned up in time for Rally
Day on September 9th |
|

Picture taken 9/10/07
The bricks in the sidewalk are removed in
preparation for digging up the driveway.
|

Picture taken 9/11/07 The driveway is dug up to
expose the top of the concrete chamber containing the steam pipe and others that
run from the education building to the church building........ and it's
finally raining! |
|

Pictures taken 9/12/07
Steve works on the siding.
|

The driveway is dug up
.......... |
|

....and the concrete slabs have been taken off the
top to expose the pipes. (The old steam pipe has already been
removed).
|

The new steam pipe is being
laid.
|
| |
|
Page 4 of Photos taken
September 10 and later
Page 2 of photos taken
August 14-21
Page 1 of photos taken
July 31-August 9 |