|
Construction - page 2
We will keep
you up to date with the progress of the construction by posting
photographs on these pages.
Photos last added to website on 9/17/07 and are on
Page
4
Photos taken August 14 -21 are on this page.
Page 1 of
Photos
taken July 31-August 9
Page 3 of Photos taken
August 22-September 7
Page 4 of photos taken September 10 and later |
|

Pictures taken 8/14/07
This section of the concrete foundation has been poured and the wooden
form removed.
|

The window that was removed from the other end of
the back wall (from the old music office) has been reinstalled where the
old door used to be. The other window shown is in the closet.
|
|

A view of the inside showing
the new closet that's now been framed in. The window in the closet
and the window where the old back door used to be can also be seen. |

A view of where the new
staircase will be located - taken looking toward the music office which
is open to the old sacristy above. Note the steel beam that had to
be cut and supported by a new steel post, in order to make room for the
new staircase. |
|

Framing for the new wall in the
music office. The staircase will be behind the wall.
|

Looking up at the framing. The old sacristy
door can be seen on the top right, and the edge of where the new door
into the sanctuary will be can be seen on the top left. |
|

Looking up at where the doorway
into the sanctuary will be located.
At the bottom of the picture
is the ceiling of the music office. |
|

Pictures taken 8/15/07 Excavating
the foundation on the south side of the music office |

|
|
 |
 |
|
 |
 |

The center section of the back wall has been
excavated and is waiting to have a new foundation.
Water is in the bottom of the ditch as the tide is in!! |

Later in the day, the tide has gone out leaving
just mud in the ditch.
|
|

Later in the day, the foundation under the side
wall of the music office has been completely removed and .... |

.....you can see straight
through from the old trap door in the back corner of the music office to
the ground below. |
|

It's a great location to work on
a nice summer's day!!! |
|

The wall for the stairwell has
been extended and runs in front of the new back exit. |

A view along the area that will
house the new staircase. |
|

Pictures taken 8/16/07
The wooden form is filled with
concrete to make a new foundation under the center of the back wall. |

Guiding the concrete into the
form |
|

The wooden form under the side
wall of the music office, waiting to be filled with concrete.
|

Pictures taken 8/20/07 The
foundation work is almost complete and the area is partly backfilled. |
|

Inside the music office looking
up at the platform for the landing that will be part way down the
stairs.
|

Looking up toward the new
platform for the landing, from where the stairs will end. The
window above is from the old sacristy and the one below from the music
office. |
|

Picture taken 8/21/07
The foundation for the stoop has been
poured. |
|
|
Page 3 of photos taken
August 22-Sept 7 |
Page 4 of photos taken
September 10 and later |
| Back to top
Back to page 1 of
photos
Back to
Recent Photos Page
Back to home |